CORNING EDGE8-02U Installation und Prüfung - Seite 7

Blättern Sie online oder laden Sie pdf Installation und Prüfung für Kontrolleinheit CORNING EDGE8-02U herunter. CORNING EDGE8-02U 13 Seiten. Tap module
Auch für CORNING EDGE8-02U: Installation und Prüfung (8 seiten)

CORNING EDGE8-02U Installation und Prüfung
8.3.
Table 2 provides a complete guide to the test sequence with a light source at the MTP Tap
module "A" ("Near end") and a meter at Module "B", or the "Far end" of the system shown in Figure 10.
Source LC Position at "A"
8.4
To begin testing the Live Portion of the MTP Tap module (Figure 10):
Step 1:
Install the Light Source/RJ1 LC connector adapter on the LC number 2 of a test
harness plugged into the front-mounted LIVE Port of the MTP Tap module.
Step 2:
Install RJ2's LC connector into the number 1 port of the EDGE8 module (Module
"B" in Figure 10).
LC #2
"A"
multimode only
LC #8
RJ1 and adapter
"Near end"
Do NOT
disconnect
Light
Source
HPA-0999-EDGE8
STANDARD RECOMMENDED PROCEDURE 003-139-AEN | ISSUE 1 | JANUARy 2017 | PAGE 7 OF 13
A-2
A-4
A-6
A-8
Table 2: Test Sequence
LC #1
Test harness
EDGE8 MTP Tap Module "A"
Meter at Module "B" LC Position
B-1
B-3
B-5
B-7
Note: Fiber loss
depends on length
of system
EDGE8 Module "B"
Do NOT
disconnect
"Far end"
Figure 10
0.00 dB
M1