Fujitsu ETERNUS DX60 S3 Handbuch zur Standortplanung - Seite 20
Blättern Sie online oder laden Sie pdf Handbuch zur Standortplanung für Lagerung Fujitsu ETERNUS DX60 S3 herunter. Fujitsu ETERNUS DX60 S3 41 Seiten. Hybrid storage systems, all-flash arrays, power synchronized unit
Auch für Fujitsu ETERNUS DX60 S3: Konfigurationshandbuch Serververbindung (12 seiten), Konfigurationshandbuch (28 seiten), Konfigurationshandbuch (13 seiten), Sicherheitsvorkehrungen (12 seiten)
Chapter 1
ETERNUS DX Installation
1.6
Installation Environment
1.6.3
Load Bearing Capacity for Floors
Make sure that the following relationship between the load bearing capacity of the floor and the weight of
the ETERNUS DX is maintained.
(Load bearing capacity of the floor) > (ETERNUS DX weight ¸ Installation area that includes service
areas)
If the condition above is not satisfied, additional measures are required to ensure sufficient load bearing ca-
pacity.
Contact your installation contractor for details about the necessary measures that must be taken.
FUJITSU Storage ETERNUS DX60 S3 Disk storage system Site Planning Guide
Copyright 2015 FUJITSU LIMITED
20
P3AM-8982-03ENZ0