AEG 1200 D Betriebs- und Installationsanleitung - Seite 17
Blättern Sie online oder laden Sie pdf Betriebs- und Installationsanleitung für Lüftungshaube AEG 1200 D herunter. AEG 1200 D 19 Seiten.
Wall mounting - Fig. 7
Sign a centerline onto the wall (1).
Fit the template onto the wall (2).
Fix the drilling template to the wall.
Make 3 Ø 8mm holes in the wall (3), 2 at upper points, 1 as desired
at lower points.
Insert the three Ø 8mm expansion plugs into the wall (4).
Insert 2 5x45 screws (5) but do not tighten them completely, hang
the hood (6).
Adjust the unit so that it is positioned at a right angle to the wall by
turning the two screws on lower side (7).
Tighten the 2 upper screws (8).
From inside the hood, insert the third 5x45 screw into the lower
hole (9) and tighten (10).
Fig. 7
70