Kohler ENGLEFIELD MILANO Installationsanleitung Handbuch - Seite 8

Blättern Sie online oder laden Sie pdf Installationsanleitung Handbuch für Armaturen für das Badezimmer Kohler ENGLEFIELD MILANO herunter. Kohler ENGLEFIELD MILANO 17 Seiten.

MILANO Round
2.3 Top Rail Assembly
(a) Place top rail onto both return glass
panels as shown below. Make sure glass
is properly inserted into rail. Top of return
glass should be flush with extrusion.
Top of return glass
flush with extrusion.
(b) Insert backing plate into outside end of
top rail. Note orientation.
(c) Insert PVC bumper into T end cap.
Note orientation.
1213953-A02-C 04/10/2013
Hole furthest from
backing plate edge
on this side
Bevel on this side
INSTALLATION INSTRUCTIONS
(c) Insert T end cap with bumper into end
of top rail on inside of shower.
Note orientation.
(d) Make sure holes align properly
and insert 16mm hex screw into T end
cap and 12mm hex screw into top rail.
Loosely tighten.
M5 x 12mm
3.0mm
3.0mm
(e) Insert gasket inbetween glass and
top rail with flat side touching glass.
(e) Tap end cap into outside of top rail
using a wooden block and soft mallet.
(f) Tighten screws. DO NOT overtighten.
(g) Repeat steps (b) to (f) for other end
of rail.
Page 8
M5 x 16mm
Profile
www.englefield.co.nz