Kohler Freshman K-4989-R Installationshandbuch - Seite 2

Blättern Sie online oder laden Sie pdf Installationshandbuch für Armaturen für das Badezimmer Kohler Freshman K-4989-R herunter. Kohler Freshman K-4989-R 20 Seiten. Urinal
Auch für Kohler Freshman K-4989-R: Wartungshandbuch (9 seiten)

Kohler Freshman K-4989-R Installationshandbuch

Tools and Materials

Safety
Tape
Glasses
Measure
Thread
Levels
Sealant
Thank You For Choosing Kohler Company
We appreciate your commitment to Kohler quality. Please take a few
minutes to review this manual before you start installation. If you
encounter any installation or performance problems, please don't
hesitate to contact us. Our phone numbers and website are listed on
the back cover. Thanks again for choosing Kohler Company.

Before You Begin

CAUTION: Risk of personal injury or product damage. Handle
with care. Vitreous china can break or chip if the product is
handled carelessly.
Observe all local plumbing and building codes.
Refer to local codes and manufacturer's instructions for flush
valve requirements.
Carefully inspect the new urinal for damage.
Fixture dimensions are nominal and conform to tolerances by
ASME Standard A112.19.2.
Site preparation may require additional tools and hardware.
Kohler Co. reserves the right to make revisions in the design of
products without notice, as specified in the Price Book.
1020646-2-C
Adjustable
Blade
Wrench
Screwdriver
Plus:
• Hole Cutting Equipment
1/4" Ratchet
2
Pencil
Kohler Co.