Kohler K-14177 Handbuch für Installation und Pflege - Seite 6
Blättern Sie online oder laden Sie pdf Handbuch für Installation und Pflege für Armaturen für das Badezimmer Kohler K-14177 herunter. Kohler K-14177 13 Seiten. Pedestal lavatories
1.
Preparation
Bracket/Support/Soporte
Backing
Renfort
Mark mounting holes.
Refuerzo
Marquer les orifices de fixation.
Marque los orificios de fijación.
Apply adhesive gaskets.
Appliquer des joints adhésifs.
Aplique los empaques adhesivos.
Top of Pedestal
Dessus de la colonne
Parte superior de pedestal
Install sufficient backing behind the finished wall to provide adequate support to
secure the mounting hardware.
Install the water supplies and drain piping according to the roughing-in
information. Ensure the supply stop handles will not make contact with the
pedestal when the supplies are fully open.
Apply four self-adhesive gaskets (provided) to the top edge of the pedestal as
shown.
Mark the centerline location on the floor. Refer to the roughing-in information for
the required distance.
Position the pedestal on the marked centerline.
IMPORTANT! The lavatory basin must be supported by the pedestal.
Carefully lift the basin and position it on the pedestal.
Verify the basin is properly supported by the pedestal.
Slowly move the pedestal as needed until the basin is positioned against the wall
at the installation location.
Level the basin by adding additional self-adhesive gaskets as needed.
CAUTION: Risk of personal injury or product damage. Product can break, chip,
or cause injury if handled carelessly. The pedestal and basin are not secured; have
someone hold the basin while you mark the mounting hole locations.
Hold the bracket in place against the underside of the basin and mark the
mounting holes on the wall.
1087257-2-B
Install backing.
Installer de renfort.
Instale del refuerzo.
Centerline
Ligne centrale
Línea central
6
Basin
Bassin
Lavabo
Pedestal
Colonne
Pedestal
Mark floor here.
Marquer le sol ici.
Marque el piso aquí.
Kohler Co.