Kohler EVOK 2.0 25164A-0 Einbauanleitung

Blättern Sie online oder laden Sie pdf Einbauanleitung für Badewannen Kohler EVOK 2.0 25164A-0 herunter. Kohler EVOK 2.0 25164A-0 5 Seiten. Seamless freestanding baths

BEFORE YOU BEGIN
Please read these instructions carefully to
familiarize yourself with the required tools, materials,
and installation sequences. Follow the sections that
pertain to your particular installation. This will help
you avoid costly mistakes. In addition to proper
installation, read all operating and safety instructions.
All information is based on the latest product
information available at the time of publication.
Kohler NZ Ltd. reserves the right to make
changes in product characteristics, packaging, or
availability at any time without notice.
These instructions contain important information
- Please leave these instructions for the consumer.
Please provide adequate available space for the
bath unit in accordance with rough-in. Arrange the
location of drain in advance.
PRODUCT REQUIREMENTS
A. Summary Of Key Requirements
Observe all local plumbing codes.
Install the unit to a level subfloor.
B. Plumbing Specifications
If using a rim-mounted bath faucet, flexible connections between the valves and spout may be required.
Confirm adequate mounting, connection space of specified faucet for your installation.
C. Product Inspection
Uncrate and inspect bath for damage. All Kohler s baths have been manufactured with sophisticated craftsmanship.
However, please inspect for any possible damage that may have occurred in transit. Leave all materials in the carton
during construction to prevent damage.
NOTE: Damage occurred during transit shall not be covered by warranty.
D. New or Replacement Installation Requirements
This bath can be installed in new or existing bathrooms. Check the roughing-in and room dimensions to provide.
adequate available space for the bath unit.
For replacement: Remove the old bath, and remove enough old wall material and floor covering from the
area to allow for installation. Remove any old plumbing that does not conform to the rough-in requirements.
For new installation: Position the plumbing according to the rough-in dimensions. Cap the supplies, and check
for leaks.
1475013-A2-A
EVOK 2.0 SEAMLESS FREESTANDING BATHS
25163A-0 / 25164A-0 / 25165A-0 / 25166A-0 / 25167A-0
IMPORTANT:
All installations must comply with council and local
authority by-laws. It is the responsibility of the installer
to ensure that the waste is made watertight.
NOTE: The bath can be installed after the wall is
completed. Bath drain supplies should be arranged
preliminarily according to the selected bath.
'
1
EVOK 2.0
INSTALLATION INSTRUCTIONS
25/02/2021