Kohler EIR Installationshandbuch - Seite 8

Blättern Sie online oder laden Sie pdf Installationshandbuch für Toiletten Kohler EIR herunter. Kohler EIR 36 Seiten. Intelligent
Auch für Kohler EIR: Handbuch für Hausbesitzer (48 seiten)

Kohler EIR Installationshandbuch
E. Discharge pipe installation
1.Take discharge pipe out, adjust to meet following condition:
a. Align discharge pipe with floor discharge port.
b. Align floor mounting hole to each hole on discharge pipe.
c. Upper discharge port center to wall distance is larger than 163mm.
Then tighten big nut on discharge pipe.
Note: ensure floor flatness.
2.Align wax center with floor drain hole and place on floor.
3.Secure discharge pipe by 3 bolts and gaskets on the floor, and ensure discharge elbow center distance to wall
distance is larger than 163mm.
1366733-T01-D
8
Kohler Co.