Kohler Englefield EVORA Back-to-Wall Installationsanleitung Handbuch - Seite 3
Blättern Sie online oder laden Sie pdf Installationsanleitung Handbuch für Toiletten Kohler Englefield EVORA Back-to-Wall herunter. Kohler Englefield EVORA Back-to-Wall 12 Seiten.
EVORA
Back-to-Wall Toilet Suite
TM
TOOLS AND MATERIALS REQUIRED
Adjustable
Spanner
Tube Cutter
Sponge
PARTS IDENTIFICATION
Shut-off Valve
(not supplied)
250mm hose for
Top/Rear install
(supplied with cistern)
Side Inlet Valve
(for Top Rear Entry.
Supplied with cistern)
Tape Measure
Safety Glasses
Screwdriver
Side Entry
Capping Plug
Cistern Bung
(supplied with cistern)
Bottom Inlet Valve
(supplied with cistern)
INSTALLATION INSTRUCTIONS
Level
Drill & Bits
Caulking Gun
3
2
Pipe Wrench
Adjustable Pliers
Metal File
1/2" Socket
Hacksaw
Silicone Sealant
Pencil
Vario Connector
(supplied)
Pan Fixing Kit
(supplied)
Water Supply Hose
(not supplied)
ENGLEFIELD
ENGLEFIELD