Kohler FLEUR WATERGUARD K-3417 AA Series Installationsanleitung Handbuch - Seite 3

Blättern Sie online oder laden Sie pdf Installationsanleitung Handbuch für Toiletten Kohler FLEUR WATERGUARD K-3417 AA Series herunter. Kohler FLEUR WATERGUARD K-3417 AA Series 8 Seiten. Vitreous china toilet

3. INSTALLATION

INSTALL NEW SHUT-OFF VALVE
For supply installation, refer to instructions packed with
supply stop.
Locate supply shut-off valve so it is "10-1/4 above floorline
and 5-1/8" to the left of the centerline of the closet flange.
Install new 5/16" diameter T-bolts.
INSTALL TOILET GASKET
Place toilet upside down in padding.
Firmly place gasket on toilet outlet. If using a gasket with
integral plastic sleeve, position gasket with sleeve facing
away from toilet.
If desired, place a 1/4"-thick bead of toilet setting com-
pound around base.
NOTE: If a rag or other plug was placed in closet flange,
remove rag from closet flange before setting toilet.
ALIGN AND SET TOILET
Carefully align and lower toilet over the closet flange and
T-bolts.
CAUTION: Risk of external leakage. Do not lift or
rock toilet after placement. A new gasket must be
reapplied if you break the watertight seal.
Apply full body weight to toilet rim to set seal.
Kohler Co., Kohler, WI
10-1/4"
12"
T-Bolts
3
5-1/8"
Fig. #3
Closet Flange
Fig. #4
Gasket
Fig. #5
Fig. #6
AA
112363–2–
(0793)