Kohler HYDRO-TOWER 300 Installationsanweisung - Seite 5

Blättern Sie online oder laden Sie pdf Installationsanweisung für Toiletten Kohler HYDRO-TOWER 300 herunter. Kohler HYDRO-TOWER 300 27 Seiten. Floor standing toilet
Auch für Kohler HYDRO-TOWER 300: Installationsanleitung Handbuch (18 seiten)

Kohler HYDRO-TOWER 300 Installationsanweisung
ROUGHING-IN
Reference Value
Back

Installation

185
Back
Installation
155

SPECIFICATION

Plumbing Connections

Recommended inlet connections are 3/8 BSP.
INSTALLATION
Install Flushing Mechanism
1. Install The Tank
1) Turn the water supply off before installing the new toilet.
2) Install the concealed tank system in wall before
decorating the wall.
3) Install the tank system per tank's installation instructions.
4) Refer to installation instructions of in-wall tank for SKU
of faceplate.
2. Install Manual Valve Or Sensor
Refer to installation instructions of manual valve or sensor
for the installation of flushing mechanism.
1332802-T01-E
Finished
Floor
P-Trap
Finished
Floor
With 1226681 S-trap
(For Separate Purchase)
1226681
(
)
Kohler reserves the right to change marked dimensions without prior notice.
"
583.5
364
140
160
102
185
515
Fig.#1
1
3/8" BSP
1.
1)
2)
3)
4)
2.
-5-
473
373.5
385
UNIT mm