Kohler INNATE INTELLIGENT TOILET Installationshandbuch - Seite 8

Blättern Sie online oder laden Sie pdf Installationshandbuch für Toiletten Kohler INNATE INTELLIGENT TOILET herunter. Kohler INNATE INTELLIGENT TOILET 31 Seiten.

Kohler INNATE INTELLIGENT TOILET Installationshandbuch
E. Discharge pipe installation
1、Take discharge pipe out, adjust to meet following condition:
a. Align discharge pipe with floor discharge port.
b. Align floor mounting hole to each hole.
c. Upper discharge port center to wall distance is larger than 104mm.
Then tighten big nut on discharge pipe.
Note: ensure floor flatness. For 305 mm model, adjusting ranges is 277~333mm, for 400mm model, adjusting
range is 372~428mm; the nut must be locked after adjustment. when start adjusting elbow, it will be easier
to adjust by loosening nut first, rotate two elbow and then rotate back to home position.
Elbow installation
hole location
2、Align wax center with floor drain hole and place on floor.
、Secure discharge pipe by 3 bolts and gaskets on the floor, and ensure discharge elbow center distance to wall
3
distance is larger than 104mm.
1382001-T01-A
8
Kohler Co.