Kohler K-10611T Installationsanweisung - Seite 21
Blättern Sie online oder laden Sie pdf Installationsanweisung für Toiletten Kohler K-10611T herunter. Kohler K-10611T 27 Seiten. Floor standing toilet
2. Make sure of h according to dimensions of bowl and then
locate the installation hole of fixing bracket. Mark on the
wall for appropriate position for fixing bracket, and drill four
holes with diameter of 10mm and depth of 80mm with
churn drilling as shown in illustration, and fill in the holes
with bulge screw and tighten the screw to set the fixing
bracket.
Note: Ensure the fixing bracket to remain level.
2.
10mm
80mm
O
3. Put the tank onto the fixing bracket as shown in the right
figure and adjust the tank to level . Then tighten screws
with hex-head key. Note: it is a must to keep the tank level.
Connect the inlet hose with tank inlet pipe.
Note: 1. Ensure water tank internal valve is OFF.
2. Suggestion: connect a temporary rubber or plastic
hose on valve, flush water supply pipeline. Ensure
water is clean, no residual sand stone or fouling
inside pipeline.
3.
1.
2.
4. Install the mask in the block screen of the tank, and
tighten the screw to fix the mask to the tank.
4.
5. Insert the inlet pipe and drainage pipe into the bowl, and
then adjust the syphon and drainage pipe to a proper
position to be fixed into the bowl. Make sure of the
positions of syphon and discharge elbow and then remove
the bowl.
5.
1263048-T01-D
h
-13-
h
Water Pipe
Connecting Pipe
Protective Cover
Discharge Elbow
Drainage Pipe
Bulge Screw
Fixing Bracket
Gasket
Spring
Nut
Level
Tank
Loosen
Tighten
Medium
Allen Key
Screw
Mask
Screw
Water Tank
Syphon
Inlet Pipe