Kohler 5E Operation - Seite 29

Blättern Sie online oder laden Sie pdf Operation für Motor Kohler 5E herunter. Kohler 5E 48 Seiten. Marine generator sets

Kohler 5E Operation
1
22
Waterline
21
1. Mounting base
2. Retaining cap
3. Reed valve assembly
4. Silencer vertical lift 1.2 m (4 ft.) max.
5. Exhaust mixer elbow distance above waterline. If less than
23 cm (9 in.), siphon break is required.
6. Siphon break distance above waterline 30.5 cm (1 ft.) min.
7. Siphon break
8. Exhaust mixer elbow
9. Heat exchanger (locations vary by model)
10. Coolant recovery tank
11. Locate coolant recovery tank at same height as heat exchanger
Figure 3-9 Siphon Break (Plastic "U" Type) Installation
Note: Consult the installation manual for complete
explanation of dimensions and other installation
considerations.
TP-5985 10/02
2
3
6
5
4
20
19
18
7
8
16
17
12. Seawater strainer
13. Seacock
14. Intake strainer
15. Engine-driven seawater pump
16. Exhaust hose pitch 1.3 cm per 30.5 cm (0.5 in. per ft.) min.
17. Water lock (optional)
18. Silencer distance from exhaust mixer elbow 3 m (10 ft.) max.
19. Silencer (customer-supplied)
20. Exhaust hose pitch 1.3 cm per 30.5 cm (0.5 in. per ft.) min.
21. Exhaust outlet distance above waterline 10 cm (4 in.) min.
22. Seawater outlet
Section 3 Scheduled Maintenance
9
10
11
12
15
13
14
TP-5586-3
17