Kohler Vanity K-2604 Handbuch für Installation und Pflege - Seite 6
Blättern Sie online oder laden Sie pdf Handbuch für Installation und Pflege für Inneneinrichtung Kohler Vanity K-2604 herunter. Kohler Vanity K-2604 41 Seiten. Vanity
Auch für Kohler Vanity K-2604: Handbuch für Installation und Pflege (37 seiten)
3. Install the Bathroom Sink
CAUTION: Risk of personal injury. Vitreous china sinks are
very heavy. Get help lifting and aligning the sink.
Install the faucet (if applicable) and drain to the sink. Refer to the
faucet and drain manufacturer's installation instructions.
NOTICE: Siliconized acrylic caulk must be used to secure the sink
to the vanity. Do not use 100% silicone sealant which will damage
the vanity finish.
Run a 1/4" (6 mm) continuous bead of siliconized acrylic caulk
around the top of the vanity, as illustrated.
NOTE: The sink is properly positioned when: (1) the back edge of
the sink is flush against the finished wall and (2) the overhang on
the left, right, and front side of the sink is equal on each side of the
vanity.
With assistance, lift and properly position the sink on top of the
vanity.
Immediately wipe away any excess caulk that contacts the vanity.
Run a 1/8" (3 mm) bead of siliconized acrylic caulk along the top
edge of the sink where it contacts the finished wall.
1267640-2-A
Finished
Wall
6
Kohler Co.