Aqua Creek Revolution Deep F-702RLNA-DD-G Handbuch - Seite 7

Blättern Sie online oder laden Sie pdf Handbuch für Hebesysteme Aqua Creek Revolution Deep F-702RLNA-DD-G herunter. Aqua Creek Revolution Deep F-702RLNA-DD-G 14 Seiten. Draft lift

Revolution Deep Draft Assembly Instructions
STEP 2: INSTALL LIFTING ARM
Locate the LIFTING ARM and the following hardware:
• (1) 1/2" x 2-3/4" SHOULDER BOLT
• (1) 3/8" x 2" SHOULDER BOLT
• (1) 5/16" FLAT WASHER
• (1) 5/16" NYLOCK NUT
• (1) 3/8" FLAT WASHER
• (1) 3/8" NYLOCK NUT
Remove the shipping strap and all packing from
the LINEAR ACTUATOR. Connect the LIFTING ARM
between the MAST and the LINEAR ACTUATOR as
shown in the fi gure below. Make sure the end marked
"B" attaches to the mast. Tighten NYLOCK NUTS (2)
until snug as shown in PHOTO 2.
DO NOT OVERTIGHTEN!
3/8" FLAT
WASHER
3/8" NYLOCK
NUT
Copyright © 2020 Aqua Creek Products All Rights Reserved
1/2" X 2 3/4"
SHOULDER BOLT
5/16" NYLOCK NUT
5/16" FLAT WASHER
ACTUATOR
STEP 2
STEP 3: INSTALL CONTROL ARM
Locate the CONTROL ARM and the following
hardware:
• (1) 1/2" x 2-3/4" SHOULDER BOLT
• (1) 3/8" FLAT WASHER
• (1) 3/8" NYLOCK NUT
Install the CONTROL ARM (end marked "A") onto
the MAST as shown in the fi gure below. Tighten the
NYLOCK NUT until snug as shown in PHOTO 3. DO
NOT OVERTIGHTEN!
3/8" FLAT WASHER
3/8" NYLOCK NUT
3/8" X 2"
SHOULDER
BOLT
LIFTING
ARM
1/2" X 2 3/4"
SHOULDER BOLT
CONTROL
ARM
STEP 3
Revised 6/25/20
7