Avlite AV-OL-CTRL-T1 Installations- und Wartungshandbuch - Seite 16

Blättern Sie online oder laden Sie pdf Installations- und Wartungshandbuch für Controller Avlite AV-OL-CTRL-T1 herunter. Avlite AV-OL-CTRL-T1 20 Seiten. Obstruction lighting controller

Avlite AV-OL-CTRL-T1 Installations- und Wartungshandbuch
4.
Wiring the Control Unit:
AC Installation:
Avlite has supplied a cord grip for installation of the power cord in the bottom of the Control
Box. Connect the incoming power conductors to the appropriate terminals (L1 and L2) on
the power switch in the Control Box.
The grounding conductor will be connected to the green/yellow GND terminal block
adjacent to the power switch.
DC Installation:
Connect the positive conductor to terminal 1 on terminal block 1.
Connect the negative conductor to terminal 3 on terminal block 1.
16