Aqua Creek Products F-194PHBL-NA Handbuch - Seite 13
Blättern Sie online oder laden Sie pdf Handbuch für Hebesysteme Aqua Creek Products F-194PHBL-NA herunter. Aqua Creek Products F-194PHBL-NA 14 Seiten.
BATTERY - LINAK 24V - 2PC
BSH - #10-24x3/8" SOCKET HEAD BOLT
2 BUTTON REMOTE
7
REMOVE THE FULLY CHARGED BATTERY FROM THE CHARGER AND INSTALL THE
BATTERY TO THE CONTROL BRACKET, ON TOP OF THE CONTROL BOX. ONCE SECURE,
CONNECT THE BATTERY CABLE TO THE CONTROL BOX CABLE. THE LIFT WILL ONLY OPERATE
WHEN THE BATTERY IS CONNECTED PROPERLY.
WHEN THE LIFT IS NOT IN SERVICE, STORE BATTERY ON THE CHARGER!
8
WITH THE LIFT FULLY ASSEMBLED AND ANCHORED, RUN THE LIFT COMPLETELY OUT
AND BACK IN 3 TO 5 TIMES, WITHOUT WEIGHT, FOR THE LIFTS "BREAK IN" CYCLE PERIOD.
CONGRATULATIONS, YOUR LIFT IS NOW READY FOR USE!
SUPER POWER EZ - MESH
COVER - UNIVERSAL BATTERY (BLUE)
WF - #10 FLAT WASHER
CATALOG NO. F-194PHBL-NA
BRACKET - LINAK MOUNT
CONTROL BOX - LINAK 2 PORT - 10 AMP
8/8/2022 12:42:18 PM PAGE - 13