Aqua Creek Products F-RNGR2-05 Handbuch - Seite 20
Blättern Sie online oder laden Sie pdf Handbuch für Beleuchtungsanlagen Aqua Creek Products F-RNGR2-05 herunter. Aqua Creek Products F-RNGR2-05 20 Seiten. Pool lift
3
3. Physical
Pool Lift Tes
A ph
hysical test o
of the lift fun
be ru
un through a
a complete c
and
with a typica
al load weig
note
es area below
w each secti
Inspe
ection Item
a
a. With all c
connections
weight to
o confirm th
any unus
sual operatio
b
b. Verify th
e lift was ins
pool with
hout hitting
c
c. Rotate lif
ft at least 90
NOT
TES/RECOMM
MENDATION
Copyright © 2021 Aqua Creek Products All Rights Reserved
A
Aqua Cr
st
nction is requ
uired when d
cycle withou
ut a load prio
ht to test th
e lifts functi
on.
connected,
operate the
e lift is funct
tioning corre
on.
stalled corre
ectly; is the li
anything lik
e a wall, rail
0 degrees ov
ver the wate
NS
reek Pro
oducts A
Annual
INS
doing an ann
nual inspect
or to each us
se. The ann
ions. Make
comments a
and/or recom
e lift though
a complete
ectly. Note
any strange
ift free to tra
avel in and o
out of the
, bench, etc
..
r and back a
again if appli
Pool Lif
ft Safety
SPECT
TION RE
EPORT
ion. NOTE:
The lift shou
uld always
ual test shou
uld be ran b
oth empty
mmendation
ns in the
Pass
cycle witho
ut
noises and
cable
Revised 5/28/21
y
T
Fail
N/A
A
20
Page 4 of 4
4