Aqua Creek Products F-RNGR2-05 Handbuch - Seite 20

Blättern Sie online oder laden Sie pdf Handbuch für Beleuchtungsanlagen Aqua Creek Products F-RNGR2-05 herunter. Aqua Creek Products F-RNGR2-05 20 Seiten. Pool lift

3
3. Physical 
Pool Lift Tes
A ph
hysical test o
of the lift fun
be ru
un through a
a complete c
and 
with a typica
al load weig
note
es area below
w each secti
Inspe
ection Item 
a
a. With all c
connections
weight to
o confirm th
any unus
sual operatio
b
b. Verify th
e lift was ins
pool with
hout hitting 
c
c. Rotate lif
ft at least 90
NOT
TES/RECOMM
MENDATION
 
Copyright © 2021 Aqua Creek Products All Rights Reserved
 
A
Aqua Cr
st 
nction is requ
uired when d
cycle withou
ut a load prio
ht to test th
e lifts functi
on. 
 connected, 
 operate the
e lift is funct
tioning corre
on.  
stalled corre
ectly; is the li
anything lik
e a wall, rail
0 degrees ov
ver the wate
NS 
reek Pro
oducts A
Annual
INS
doing an ann
nual inspect
or to each us
se.  The ann
ions.  Make 
comments a
and/or recom
e lift though 
a complete 
ectly.  Note 
any strange 
ift free to tra
avel in and o
out of the 
, bench, etc
..   
r and back a
again if appli
Pool Lif
ft Safety
SPECT
TION RE
EPORT
 
 
ion.  NOTE: 
The lift shou
uld always 
ual test shou
uld be ran b
oth empty 
mmendation
ns in the 
Pass 
cycle witho
ut   
noises and 
 
cable 
 
Revised 5/28/21
y
T
 
Fail 
N/A
 
 
 
 
 
 
20
Page 4 of 4