Avocent Cybex SwitchView SC8 DVI Handbuch zur Schnellinstallation

Blättern Sie online oder laden Sie pdf Handbuch zur Schnellinstallation für Schalter Avocent Cybex SwitchView SC8 DVI herunter. Avocent Cybex SwitchView SC8 DVI 2 Seiten. Dvi switch
Auch für Avocent Cybex SwitchView SC8 DVI: Handbuch zur Schnellinstallation (2 seiten), Handbuch zur Schnellinstallation (2 seiten)

Avocent Cybex SwitchView SC8 DVI Handbuch zur Schnellinstallation
The following instructions will help you
install your SwitchView SC8 DVI switch.
Should you require further assistance, please
contact Avocent Technical Support.
1
Connecting local peripherals
Power down all servers that will be part of your
SwitchView SC8 DVI switching system. Locate
your PS/2 keyboard, DVI monitors and PS/2
mouse. Plug your DVI monitor cables into the
CONSOLE ports on the left side of the back
of your switch. Plug your PS/2 keyboard cable
and your PS/2 mouse cable into the keyboard
and mouse ports respectively.
2
Connecting your servers
Locate your first cable set consisting of two
PS/2 cables and one or two DVI cables. The
SwitchView SC8 DVI switching system has
eight port sets labeled A-H on the rear of the
unit. Plug the two PS/2 cables (keyboard
and mouse) and the DVI cable (monitors)
into the corresponding ports on your server.
Plug the other ends into any available server port
set on your SwitchView SC8 DVI switching system.
Repeat this process until all servers are properly
attached to the SwitchView SC8 DVI switch.
3
Powering your system
Locate the power cord that came with your switch.
Plug one end into the IEC power connector on
the SwitchView switch. Ensure the power switch
is off, then plug the other end of the power cord
into an AC wall outlet. Power up your switch first,
then power up all attached servers.
To Contact Avocent Technical Support
Avocent, the Avocent logo, The Power of Being There, Cybex and SwitchView are registered trademarks of Avocent Corporation or its affiliates. ©2006 Avocent Corporation. All rights reserved.
Quick Installation Guide
Cybex
SwitchView
®
SC8 DVI Switch
To install the Cybex SwitchView SC8 DVI switch
Optional
RF ground
(not required
for safety)
3
Power up
your system.
4
Switching your servers
Press the appropriate front panel button labeled A-H to
access servers in your SwitchView switching system.
Environmental
Operating Temperature: 41˚ (5˚C) to 104˚ (40˚C)
Storage Temperature: -4˚ (-20˚C) to 122˚ (50˚C)
Input Power: 60 W; Operating Voltage 100-240 VAC
Power Frequency: 50-60 Hz
CALL (888) 793-8763
The Power of Being There
1
Power down all
connected servers.
Connect your
peripherals to the
CONSOLE ports
on the switch.
Supported Hardware
Server: IBM, PC/AT, PS/2 and 100% compatibles
Video Modes: VGA, SVGA, XGA, SXGA, UXGA,
HDTV and QXGA
Maximum Resolution: 2048 x 1536 @ 75Hz
Peripherals: PS/2 keyboard, PS/2 mouse and
IntelliMouse (PS/2 only)
Mechanical
H x W x D = 3.6" x 17.2" x 10.8" (9.1 x 43.7 x 27.4 cm)
Weight = 9.5 lbs (4.3 kg)
VISIT www.avocent.com/support
®
®
4
Press the
appropriate front
panel button
labeled A-H to
access servers in
your system.
2
Connect the eight
servers to the
switch with the
provided cables.
DOWNLOAD www.avocent.com
590-502-501C