BUILDING A THREE FRAME HIGH SCAFFOLD

If the platform height needed is over 11' 6", it will be necessary to install 24" wide
outriggers prior to stacking additional scaffold levels to the base unit.
STEP ONE
Erect the base
unit (one frame high scaffold) by
following the previous instructions.
STEP THREE
Clamp must be flush against scaffold leg and casters must be in contact with the surface.
Top View
Outrigger
Frame
STEP FOUR
railing (at each work level) per the previous instructions (Building a One Frame High Scaffold
and Building a Two Frame High Scaffold). Side braces should be evenly spaced in pairs
throughout the scaffold tower.
STEP TWO
(4) wide outriggers and secure with snap pin
provided with each caster. Set caster brake.
Clamp outriggers to end frame with two piece clamp. Tighten clamp securely.
Side View
Tighten
Securely
Outrigger
Add additional scaffold end frames, side braces, platforms, and guard
There must be a minimum of two side braces
installed in each scaffold level and evenly spaced
throughout the scaffold. Lack of adequate
bracing could cause scaffold to collapse with
serious injury or death to the user.
Install casters into all four
Frame Leg
WARNING