Allied Systems SJN Handbuch für Installation, Wartung und Service - Seite 3

Blättern Sie online oder laden Sie pdf Handbuch für Installation, Wartung und Service für Industrielle Ausrüstung Allied Systems SJN herunter. Allied Systems SJN 17 Seiten.

SECTION 1 NAMEPLATE LOCATION

Notice
When you receive your attachment,
locate the Long Reach nameplate (upper
left corner on the body). Record the
information from the nameplate, along
with the date received, at the bottom of
this page. If the nameplate is missing, look
for the serial number stamped directly into
the metal at the nameplate location and
consult the factory for details.
A
Date received:
-
-
45-015, REV. 9/21
B