Allied Telesis CentreCOM GS980M Series Handbuch zur Schnellinstallation - Seite 13
Blättern Sie online oder laden Sie pdf Handbuch zur Schnellinstallation für Schalter Allied Telesis CentreCOM GS980M Series herunter. Allied Telesis CentreCOM GS980M Series 20 Seiten. Gigabit ethernet switches
2. Slide the transceiver into the port until it clicks into place.
To attach the fiber optic cable to the transceiver, continue with
the next step. Otherwise, repeat steps 1 ans 2 to install the
remaining transceivers in the switch.
3. Remove the dust cover from the transceiver.
4. Connect the fiber optic cable to the transceiver. The connector
should fit snugly into the port, and the tab should lock the
connector into place.
5. Repeat this procedure to install additional transceivers.
6. Go to "Powering On the Switch" on page 13.
Powering On the Switch
Warning: Power cord is used as a disconnection device.
To de-energize equipment, disconnect the power cord.
1. Install the power cord retaining clip on the AC power connector
on the rear panel of the switch, and raise the clip.
2. Connect the power cord to the connector and lower the retaining
clip to secure the power cord.
CentreCOM GS980M Series Quick Installation Guide
E3
13