CPS VORTECH 2 Schnellstart-Handbuch - Seite 2
Blättern Sie online oder laden Sie pdf Schnellstart-Handbuch für Messgeräte CPS VORTECH 2 herunter. CPS VORTECH 2 4 Seiten. Valve manifold
EVACUATING PROCEDURE
1. Remove all refrigerant from the
system. NOTE: It is unlawful to
discharge or exhaust refrigerants into
the atmosphere. CPS strongly
recommends the practice of recovery
or recycling.
2. Connect a vacuum pump to the center
yellow charging hose.
3. Connect the high side service valve of
the system to the right side red
charging hose.
4. Connect the low side service valve of
the system to the left side blue hose.
5. Fully open the high and low side hand
knobs.
6. Start the vacuum pump.
7. Evacuate the system according to the
manufactuer's specifications; close the
high and low side hand knobs.
8. Turn off the vacuum pump.
9. Disconnect the yellow charging hose
at the vacuum pump end and connect
it to the refrigerant supply tank. (Make
sure to turn shut off valve, off before
disconnecting).
10.Slightly open the valve on the
refrigerant supply tank and purge the
air from the yellow hose at the
manifold by loosening the yellow hose
fitting, the close fitting and container
valve.
CHARGING PROCEDURE
1. Follow the manufacturer's
recommended specification for the
amount of refrigerant to charge in that
system. Should it specify to charge the
system on that high side, close the low
side service valve. Open the
refrigerant supply container valve,
then open the high side (red label)
hand knob of
the manifold. After the proper amount
of refrigerant has been transferred,
close the high red label hand knob of
the manifold; also close the
refrigerant supply container valve.
2. When the proper charge has been
achieved, open the low side service
valve on the system.
3. Run the compressor as per the
manufacturer's specifications and
observe the pressure gauge reading
and compare to the manufacturer's
specifications to determine that the
system is operating correctly. If no
adjustments need to be made, then
read step 4. If not, follow proper
procedures to repair or adjust the
system.
4. Close the high and low side service
valve of the system before removing
the charging hoses from the system.
Follow all safety practice procedures.
WARNING: Remove all hoses with care as
they may contain refrigerant.
A
LO
OPEN
OPEN
CLOSE
CLOSE
1
2
REFRIGERANT
CYLINDER
B
DISCHARGE
3
C
SUCTION
COMPRESSOR
VACUUM
PUMP
D