Allied Telesis AT-8800 Series Handbuch zur Schnellinstallation - Seite 4

Blättern Sie online oder laden Sie pdf Handbuch zur Schnellinstallation für Netzwerk-Router Allied Telesis AT-8800 Series herunter. Allied Telesis AT-8800 Series 8 Seiten. How to set up pppoe between a linux client and access concentrator
Auch für Allied Telesis AT-8800 Series: Fehlersuche (5 seiten), So konfigurieren Sie (9 seiten), Anleitungen (8 seiten)

Allied Telesis AT-8800 Series Handbuch zur Schnellinstallation
4

Selecting a Site

The switch can be installed in a standard 19-inch rack or on a level surface such
as a desktop or bench. When installing the switch, choose a site that:
Allows adequate airflow around the switch and its vents.
Is free of dust and moisture.
Will maintain an ambient temperature range of 0-50º C (32-122º F) and a
humidity range of 5-95% non-condensing.
Has a reliable and earthed (grounded) power supply circuit, preferably
dedicated and filtered.
Does not expose cabling to sources of electrical noise, such as radio
transmitters, broadband amplifiers, power lines, electric motors, and
fluorescent fixtures.
Allows easy access to the switch's power and cable connections.
Will allow all related network devices to be connected to the switch
without exceeding maximum cable length limitations. See the AT-8800
Series Hardware Reference for cable length specifications.

Installing the Switch

This equipment must be earthed.
Follow these steps to install the switch:
1.
Read the safety information
For safety information, see the Safety and Statutory Information booklet. A
copy of this booklet is supplied with each switch, and can also be found on
the Documentation and Tools CD-ROM or at
software.
2.
Gather the tools and equipment you will need
If the switch is to be connected to a redundant power supply, you will need
a redundant power supply unit and cable (see step 8).
To install the switch in a rack you will need screws and cage nuts to attach
the brackets to your rack. These are supplied with the switch.
3.
Choose a suitable site for the switch
Either a flat surface or 19 inch rack.
4.
Unpack the switch
Verify the package contents. If any items are damaged or missing, contact
your sales representative.
AT-9800 Series Switch
www.alliedtelesis.com/support/
C613-04043-01 REV D