DGS Retail APTE3 Schnellstart-Handbuch - Seite 6
Blättern Sie online oder laden Sie pdf Schnellstart-Handbuch für Inneneinrichtung DGS Retail APTE3 herunter. DGS Retail APTE3 8 Seiten. Produce table
ASSEMBLE CASTERS
7
- Screw in casters into weld nuts on legs, install casters with brakes across front of the table.
FRONT OF
TABLE
ASSEMBLE FRONT LIP Z-CHANNEL
8
- Flip table upside-down and set it on casters.
- Slide the z-channel on top front tube, make sure that holes on channel
are aligned with rivet-nuts on the back of tube.
- Attach channel to tube with (5x) #10-24 x 0.500 machine screws.
(x5)