Dell Latitude 13 Education Series Technisches Handbuch - Seite 42

Blättern Sie online oder laden Sie pdf Technisches Handbuch für Laptop Dell Latitude 13 Education Series herunter. Dell Latitude 13 Education Series 42 Seiten.
Auch für Dell Latitude 13 Education Series: Schnellstart-Handbuch (2 seiten)

Dell Latitude 13 Education Series Technisches Handbuch
Dell Latitude 13 Education Series
Operating conditions and MIL-STD 810G Testing
Models
Temperature Range
Relative humidity (maximum)
Altitude (maximum)
MIL-STD-810G Tests Performed
Link to Product Safety, EMC and Environmental Data Sheets:
http://www.dell.com/content/topics/global.aspx/about_dell/values/regulatory_compliance/dec_conform?c=us&cs=04&l=en&s=bsd&redirect=1
1
Tests completed by independent 3
42
Dell Latitude 13 Education Series
Operating 0° to 35°C (32° to 95°F)
Storage –40° to 65°C (–40° to 149°F)
Operating 10% to 90% (non-condensing)
Storage 5% to 95% (non-condensing)
Operating –15.2 to 3048 m (–50 to 10,000 ft)
Storage –15.2 to 10,668 m (–50 to 35,000 ft)
1. METHOD 500.5 LOW PRESSURE (ALTITUDE) Procedure I - Storage/Air Transport
2. METHOD 500.5 LOW PRESSURE (ALTITUDE) Procedure II - Operation/Air Carriage
3. "METHOD 501.5 HIGH TEMPERATURE Procedure I Induced (Storage and Transition) Conditions "
4. "METHOD 501.5 HIGH TEMPERATURE Procedure II – Operation Cycling temperature exposure"
5. METHOD 502.5 LOW TEMPERATURE Procedure I (Exaggerated)
6. METHOD 502.5 LOW TEMPERATURE Procedure II
7. "METHOD 507.5 HUMIDITY Procedure I - Induced (Storage & Transit) and Natural and CyclesTable
507.5-I Hot-humid (Cycle B3)"
1
8. METHOD 510.5 SAND AND DUST Procedure I
9. IP5x Dust Ingress Duration: 8 hours (Current result: failed)
10. METHOD 514.6 VIBRATION Procedure I
11. METHOD 514.6 VIBRATION Procedure I
12. Method 516.6 SHOCK Procedure I: Functional Shock
13. "Method 516.6 SHOCK Procedure IV: Transit Drop; Modified to be dropped at 30"""
14. Method 516.5 SHOCK Procedure II: Material to be Packaged
15. Method 516.5 SHOCK Procedure V: Crash Hazard Shock
16. Method 516.6 SHOCK Procedure VI: Bench Handling
rd
party ISO/IEC-17025 certified laboratories.