Dell PowerEdge 6350 Rack-Einbau - Seite 27

Blättern Sie online oder laden Sie pdf Rack-Einbau für Server Dell PowerEdge 6350 herunter. Dell PowerEdge 6350 34 Seiten. Dell poweredge 6350 servers: install guide
Auch für Dell PowerEdge 6350: Handbuch installieren (8 seiten), Rack-Einbau (34 seiten), Rack-Einbau (35 seiten)

Dell PowerEdge 6350 Rack-Einbau
support.dell.com
' *!
Attach the cable tray to the PowerEdge or PowerVault computer chassis using the five
6-32 x 0.25-inch hex-head Phillips screws (see Figure 1-10).
- '+#.
' *
The cable management arm can be installed on either the left side or the right side of
the cable tray. See "Reversing the Cable-Management Arm Installation" found later in
this document.
To install the cable-management arm on the back of the computer, perform the follow-
ing steps:
1.
Facing the back of the rack cabinet, attach the right-angle bracket of the cable-
management arm to the vertical rail (see Figure 1-11). The bracket slides into the
square mounting holes on the vertical rail and is secured with the captive
thumbscrew.
back of computer
cable tray
6-32 x 0.25-inch hex-head Phillips screws (5)
Rack Installation Guide
1-13