Dell EMC PowerSwitch S6100-ON Installationshandbuch - Seite 16
Blättern Sie online oder laden Sie pdf Installationshandbuch für Schalter Dell EMC PowerSwitch S6100-ON herunter. Dell EMC PowerSwitch S6100-ON 48 Seiten.
NOTE:
Never use the same bolts to secure multiple grounding cables.
For rack spans from 22 to 23.375 inches
The switch ships without the ground lug attached. To be NEBS-compliant, attach the ground lug using these steps.
Figure 6. Switch without ground lug
1. Remove the ground lug from the shipping bag and crimp the ground wire to the lug.
The ground wire is not included.
NOTE:
The grounding cable must comply with your local electrical codes in size and color. Wires are typically green or
green with a yellow stripe.
2. Attach the ground lug to the mounting bracket using two M5 nuts, included.
Torque to 30 in-lb.
Figure 7. Switch with ground lug
NOTE:
For proper ventilation, position the chassis in an equipment rack or cabinet with a minimum of 5 inches (12.7
cm) of clearance around exhaust vents. The acceptable ambient temperature ranges are listed in the Environmental
Parameters section.
3. Attach the rack rails to the rack using four screws on the front of the rack and eight screws on the back of the rack.
Rack rail screws are not included.
16
NEBS compliance