Dell EMC S4112-ON Series Setup-Handbuch - Seite 9

Blättern Sie online oder laden Sie pdf Setup-Handbuch für Schalter Dell EMC S4112-ON Series herunter. Dell EMC S4112-ON Series 26 Seiten.

Dell EMC S4112-ON Series Setup-Handbuch

Fans and airflow

Fan installation is done as part of the factory install based on stock keeping unit (SKU) type.
The S4112-ON Series switch has SKUs that support the following configurations:
AC PSU with PSU fan and system fans normal airflow
AC PSU with PSU fan and system fans reverse airflow
DC PSU with PSU fan and system fans normal airflow
DC PSU with PSU fan and system fans reverse airflow
For proper ventilation, position the switch in an equipment rack or cabinet with a minimum
of 5 inches (12.7 cm) of clearance around the exhaust vents. The fan speed varies based on
internal temperature monitoring. The switch never intentionally turns off the fans.

Power

To connect the switch to the applicable power source, use the appropriate power cable. An
AC power cable is included with the switch.
When installing AC or DC switches, follow the requirements of the National Electrical Code
ANSI/NFPA 70, where applicable.
The switch is powered-up when the power cable is connected between the switch and the
power source.
CAUTION:
Always disconnect the power cable before you service the power supply
slots. The switch has multiple power cords. Before servicing, ensure all power cords
are disconnected.
CAUTION:
On the AC switch, use the power supply cable as the main disconnect
device. Ensure that the socket-outlet is located/installed near the equipment and is
easily accessible.
NOTE:
Module power is software controlled. You do not see module LEDs when the
switch powers up in ONIE.
Site preparations
9