Dell Networking N2024 Installationshandbuch - Seite 34
Blättern Sie online oder laden Sie pdf Installationshandbuch für Schalter Dell Networking N2024 herunter. Dell Networking N2024 49 Seiten.
Auch für Dell Networking N2024: Firmware-Upgrade (21 seiten)
![Dell Networking N2024 Installationshandbuch](/uploads/products/server2/3223512/3223512.png)
Figure 20. 4-Post Threaded Configuration
Install the N30xx System
You can mount the system in the 1U front-rack or 1U two-post (flush and center) configurations. The following is an example of a front-
rack configuration.
For the 1U two-post (flush and center) configurations, slide the system into the rails in the same manner as the four-post configurations.
Installing a 1U Front-Rack
You must configure the rails that are attached to the system.
1
Attach the switch rails (inner chassis members) to the N30xx system. Item 3 in the following illustration shows the detail for the front
standoff with the locking tab.
N30xx Series Installation
33