EarthWay EV-N-SPRED 2150 Montage- und Betriebsanleitung - Seite 3
Blättern Sie online oder laden Sie pdf Montage- und Betriebsanleitung für Streuwagen EarthWay EV-N-SPRED 2150 herunter. EarthWay EV-N-SPRED 2150 6 Seiten. 50 lb. commercial spreader with side spread control
Auch für EarthWay EV-N-SPRED 2150: Montage- und Betriebsanleitung (8 seiten), Montageanleitung Handbuch (9 seiten)
7.
Slide axle bushing over axle and into axle
bearing to both sides as shown.
9.
Install coast wheel to axle using outside pin hole. As shown, insert 1" cotter pin
through axle (not thru the wheel). Bend with pliers to prevent pin from falling out.
TURN SPREADER UPRIGHT ON TO WHEEL.
Axle bearing
Axle bushing
Slide Axle
bushing
8.
Install drive wheel to axle using pin hole nearest to lower handles as shown. Insert 2" cot-
ter pin through wheel and through axle. Bend with pliers to prevent pin from falling out.
10.
NOTE: BEFORE INSTALLING GAUGE AND UPPER
HANDLES TO HANDLE SHAFT, UPPER HANDLES FEATURE
THREE POSITIONS FOR OPERATOR'S COMFORT.
chooses middle or upper positions, use handle spacer in hole nearest
to handle grips. Insert 1¾" bolt through upper handle
handle spacer through other upper
NUT YET. TIGHTEN THIS NUT LAST.
(2) 1¾" bolts. Be sure gauge is on left hand side. Tighten locknuts
to gauge first. TIGHTEN NOW.
11.
Insert pivot rod into shut off plate as shown. Turn to lock in
place.
12.
Insert other end of pivot rod into pivot and bracket assembly as
shown. Turn to lock in place.
If operator
then through
,
handle. DO NOT TIGHTEN LOCK-
Install gauge & lever using
PAGE 3