Miele AWG 102 Installationsanleitung Handbuch - Seite 18
Blättern Sie online oder laden Sie pdf Installationsanleitung Handbuch für Lüftungshaube Miele AWG 102 herunter. Miele AWG 102 28 Seiten. External motor roof installation
Auch für Miele AWG 102: Betriebs- und Installationshandbuch (24 seiten), Betriebs- und Installationsanleitung (28 seiten), Installationsanleitung Handbuch (28 seiten)
Installation
The ducting collar on the motor unit has
a diameter of 150 mm as standard.
If a diameter of 125 mm is required a
reducing collar must be used.
This is available to order from Miele.
Push the flexible ducting onto the
collar and secure it with a hose clip.
Ducting with a diameter of 150 mm is
then connected to the exhaust side.
If the exhaust air is to be ducted into
the open air, a telescopic wall vent kit
can be used. This is available to order
from Miele.
If the motor is installed vertically with
the exhaust ducting venting over a
roof, a roof vent kit DDF 125/150 or
similar must be used to prevent
rainwater from penetrating the
exhaust opening.
18
Connect the control cable plug
connectors.
Use the extension cable supplied to
lengthen the control cable if
necessary.
If equipotential bonding is required,
connect the earth lead to the earthed
connection point in the housing.
Equipotential bonding is required if
the control cable is to be extended
by more than the length of the
extension cable supplied (see
"Electrical connection").