360 Yield 360 Y-DROP JOHN DEERE 4730 Gebrauchsanweisung - Seite 3

Blättern Sie online oder laden Sie pdf Gebrauchsanweisung für Landwirtschaftliche Geräte 360 Yield 360 Y-DROP JOHN DEERE 4730 herunter. 360 Yield 360 Y-DROP JOHN DEERE 4730 11 Seiten.

ESTABLISH
I.
DROP LOCATIONS
Figures 1 and 2
Step 1
Locate the center of the machine and
identify the location of all the drops. On
the sprayer boom, mark where each riser
mount will be located. This will ensure
that the extension tubes will not interfere
with the riser mounts.
Figure 3
Step 2
Starting at the wing fold pivot pin on
the primary boom, measure and mark
points at 32", 86", 156"; 213" and 277"
(all measurements are ±5"). Repeat for
the other primary boom.
INSTRUCTIONS 360 Y-DROP
Figure 1
Figure 2
277"
213"
156"
86"
32"
Figure 3
360YIELDCENTER.COM
JOHN DEERE 4730/4830
3