Miele DA 216-2 EXT Betriebs- und Installationsanleitung - Seite 24

Blättern Sie online oder laden Sie pdf Betriebs- und Installationsanleitung für Lüftungshaube Miele DA 216-2 EXT herunter. Miele DA 216-2 EXT 40 Seiten. Miele operating and installation instructions cooker hoods da 216-2, da 216-2 ext, da 217-2, da 219-2, da 219-2 ext

There are three retaining plates A, B
and C for fixing the cooker hood to the
wall.
First of all drill the holes for attaching
the canopy and for fitting retaining
plate A.
24
Before fitting the retaining plate draw
a vertical line centrally above the
hob on the back wall.
Mark measurement S from the hob
surface upwards (see "Appliance
dimensions"). This marks the height
of the lower rim of the cooker hood.
DA 216-2 / EXT, 217-2:
Drill an 8 mm ø hole on the middle
line 18 mm above the height marked
. Insert an S8 plug into the hole.
DA 219-2 / EXT:
Drill two 8 mm ø holes, 18 mm above
the height marked
right and left of centre. Insert S8
plugs.
Drill two 8 mm ø holes, one at
100 mm and one at S + 425 mm on
the centre line for the retaining plate
(see "Appliance dimensions"). Insert
S8 plugs.
and 250 mm
+