Miele DA 219-2 Betriebs- und Installationsanleitung - Seite 29
Blättern Sie online oder laden Sie pdf Betriebs- und Installationsanleitung für Lüftungshaube Miele DA 219-2 herunter. Miele DA 219-2 40 Seiten. Ventilation system
Auch für Miele DA 219-2: Betriebs- und Installationsanleitung (44 seiten)
For appliances connected to an ex-
ternal fan, model designation...EXT:
Connect the control unit and the ex-
ternal fan with the connection cable
and the six pole plug.
Connect the appliance to the mains
via a fused spur or fused socket as
appropriate.
Before connecting the appliance
read the safety notes in "Warning
and Safety Instructions" and in the
"Electrical connection" section.
For extraction connection secure a
flexible hose or an extraction pipe to
the exhaust connection on the motor
unit using a hose clip.
Lead the top end to the open air or
to the external fan through the wall or
ceiling cut-out.
For further installation instructions,
proceed to "Connection for air extrac-
tion".
29