Miele DA 220-4 Betriebs- und Installationsanleitung - Seite 31

Blättern Sie online oder laden Sie pdf Betriebs- und Installationsanleitung für Lüftungshaube Miele DA 220-4 herunter. Miele DA 220-4 40 Seiten. Ventilation system
Auch für Miele DA 220-4: Betriebs- und Installationsanleitung (36 seiten), Handbuch der Abmessungen (2 seiten)

Miele DA 220-4 Betriebs- und Installationsanleitung
^ Using at least two people, lift the
hood and guide the spring clips
through their respective slots in the
flange at the top of the chimney.
Make sure they click into place and that
the hood is hanging securely from the
spring clips before allowing them to
carry the weight.
^ Bolt the flange firmly to the ceiling
using the four M 6 locking nuts.
^ Shorten the power cable as much as
possible and attach it to the terminal
block inside the chimney. See
"Electrical data".
Before connecting the appliance
read the "Important Safety
Instructions" and "Electrical data"
sections.
Installation
31