Miele Imperial DWF 956-2 Betriebs- und Installationsanleitung - Seite 28
Blättern Sie online oder laden Sie pdf Betriebs- und Installationsanleitung für Lüftungshaube Miele Imperial DWF 956-2 herunter. Miele Imperial DWF 956-2 37 Seiten.
Installation - Venting
– Bend the hanging retainers approx.
45° inwards. This makes fitting easier.
– Pull the telescopic extension piece
apart slightly and hang onto the
upper retaining plate.
28
– Screw the telescopic extension
piece firmly to the upper retaining
plate at each side with two 3.9 x 7.5
screws.
The paper protective sheets protect the
extension piece from accidental
scratching when the tower is being
fitted. They are removed when fitting is
complete.
– Fold the protective sheets at the top.
– Remove the protective foil around
the sticking points.
– Stick the protective sheets on to the
sides of the telescopic extension
piece.