Burkert 0131 Betriebsanleitung - Seite 10

Blättern Sie online oder laden Sie pdf Betriebsanleitung für Kontrolleinheit Burkert 0131 herunter. Burkert 0131 16 Seiten. 2/2- or 3/2-way solenoid valve
Auch für Burkert 0131: Betriebsanleitung (16 seiten)

Burkert 0131 Betriebsanleitung
5.2

Before installation

Installation position: any, actuator preferably upwards.
Procedure:
Check pipelines for dirt and clean.
Install a dirt filter before the valve inlet (≤ 500 µm).
5.3
Installation
Insert O-ring
Insert
Tighten union nut - evenly by
hand only
NOTE!
Caution risk of breakage!
• Do not use the coil as a lever arm.
Body with welded sleeve: Use PVDF.
Body with PVC bonded sleeves: Use Tangit special adhesive.
Valve body must not be installed under tension.
Sealing material must not get into the device.
Observe direction of flow:
The arrow or letter on the body indicates the direction of flow:
from P → A (NC) or from P → B (NO).
english
9