Miller CST 280 Benutzerhandbuch - Seite 31

Blättern Sie online oder laden Sie pdf Benutzerhandbuch für Schweißen System Miller CST 280 herunter. Miller CST 280 48 Seiten. Dual rack kit
Auch für Miller CST 280: Benutzerhandbuch (28 seiten)

Miller CST 280 Benutzerhandbuch
SECTION 5 − MAINTENANCE AND TROUBLESHOOTING

5-1. Routine Maintenance

3 Months
Replace
unreadable
labels.
3 Months
Repair Or Replace
Cracked Cables
And Cords
6 Months

5-2. Blowing Out Inside Of Unit

Y Disconnect power before maintaining.
.
Maintain more often during severe conditions.
Clean and tighten
weld terminals.
Y Do not remove case when
blowing out inside of unit
(see Section 5-2) .
Blow out inside. During
heavy service clean
monthly.
Replace Damaged
Gas Hose
Y Do not remove case when
blowing out inside of unit.
To blow out unit, direct airflow
through front and back louvers as
shown.
803 942-A
OM-217 655 Page 27