Miller WC-115A Benutzerhandbuch - Seite 22

Blättern Sie online oder laden Sie pdf Benutzerhandbuch für Schweißen System Miller WC-115A herunter. Miller WC-115A 32 Seiten.

Miller WC-115A Benutzerhandbuch

4-1. 115 Volt Model Controls

4-2. Shielding Gas

SECTION 5 − MAINTENANCE & TROUBLESHOOTING
Damaged Or
OM-1078 Page 18
SECTION 4 − OPERATION
1
3
Replace
Unreadable
Labels
2
2
1
!
Disconnect power
before maintaining.
3 Months
Clean
And
Tighten
Weld
Terminals
6 Months
Blow Out Or
Vacuum Inside
1
Run-In Speed Control
Use control to select welding wire
speed before arc initiation. After arc
initiation, the wire feed speed is
controlled by the Wire Speed
control on the gun/feeder.
2
Power Switch
Use switch to turn unit On and Off.
wfcontrols_1 1/96 / Ref. 144451-D
1
Shielding Gas Cylinder
2
Valve
Open valve on cylinder just before
welding.
Close valve on cylinder when
finished welding.
3
Regulator/Flowmeter
sb5.1* 6/92 − S-0621-C
.
Maintain more often
during severe conditions.
Replace Damaged
Gas Hose
Repair Or Replace
Cracked Cables
And Cords