Miller Soft Start 2-2F Benutzerhandbuch - Seite 18
Blättern Sie online oder laden Sie pdf Benutzerhandbuch für Zubehör für das Schweißen Miller Soft Start 2-2F herunter. Miller Soft Start 2-2F 24 Seiten. Om-189 112
4-3. Work Clamp
4-4. Shielding Gas
4-5. Sequence of Gas Tungsten Arc Welding (GTAW)
Install &
Install & Connect
Connect
High-Frequency
Equipment
Set Controls
OM-189 112 Page 14
1
2
3
1
Select
Tungsten
Unit
Turn On
Shielding Gas
High-Frequency
Tools Needed:
4
OR
Insert
Tungsten
Personal Safety
Into Torch
Turn On
Begin Welding
Unit
1
Work Clamp
Connect work clamp to a clean,
paint-free location on workpiece, as
close to weld area as possible.
Use wire brush or sandpaper to
clean metal at weld joint area. Use
chipping hammer to remove slag
after welding.
1
Shielding Gas Cylinder
2
Valve
3
Torch Output Control
4
Foot Control
Open valve on cylinder just before
welding.
Torch output control or foot control
turns weld output and gas flow on
and off.
The postflow timne is preset for 10
seconds. See circuit diagram fo
rthe location of an adjustment potie-
meter on PC1.
Close valve on cylinder when fin-
ished welding.
sb5.2* 5/94 – S-0621-C / S-0769
Put On
Turn On
Welding Power
Equipment
Source
sb4.1 2/93
ssb8.1 12/92