Chromalox PK407-4 Installation, Betrieb und Erneuerung Identifizierung der Teile - Seite 3

Blättern Sie online oder laden Sie pdf Installation, Betrieb und Erneuerung Identifizierung der Teile für Thermostat Chromalox PK407-4 herunter. Chromalox PK407-4 4 Seiten. Type ar industrial thermostat (three phase)

ELECTRIC SHOCK HAZARD. Disconect all power to
heater before installing or servicing thermostat.
Failure to do so could result in personal injury or
property damage. Thermostat must be installed by a
qualified person in accordance with the National
Electrical Code, NFPA 70.
1. Electric wiring to heater must be installed in accordance with
local and National Electrical Codes.
CAUTION: Use copper conductors only.
2. Entrance for wiring is provided by two
of base plate.
3. If control is a "KC" model (Knob Cover), remove knob cover
as in Figure 5.
4. Set thermostat knob to OFF position and then remove knob by
lifting knob from shaft. (See Figure 6)
5. Loosen two screws from end of base plate and remove ther-
mostat cover (see Figure 7).
1
L1
Figure 8 — Three-Phase "Y" Load
Note: One line (terminals 5-6) is controlled by the dial and is on continually whenever the dial is moved from the off position. The other
two lines are thermostatically controlled and cycle with the rise or fall in temperature.
Figure 10
ELECTRIC SHOCK HAZARD. Disconnect all power
before attempting to calibrate thermostat. Failure
to comply could result in personal injury.
These controls are factory calibrated to the range indicated on
the control adjustment knob.
1
/
" conduit holes in end
2
5
6
2
3
4
L2
L3
Pilot Light
(Optional)
Thermometer
Load (Tank, vat, die or platen)
WIRING
6. Connect wires according to wiring diagrams (Figures 8 thru
12). Note: Electrical connections should be made with gener-
ous loops of wire — approximately 6" per lead.
7. Replace cover, tighten screws, replace dial knob and dial knob
cover.
8. Note: If load amperage or voltage rating exceeds switch rating,
a contactor must be used. Contactor and wiring to be supplied
by customer.
Figure 5
L1
CALIBRATION
Figure 11
If calibration is required, either one of two methods may be
followed.
1. If accurate measurement standards are not available, the ther-
mostat can readily be adjusted to a known temperature stan-
dard such as boiling water (212°F) (see Figure 10).
2. With the aid of an accurate thermometer or other temperature
measuring device, recalibration may be performed within the
process as in Figure 11.
Figure 6
5
2
3
4
1
Pilot Light
L2
(Optional)
Figure 9 — Three-Phase Delta Load
Figure 12
Figure 7
6
L3