Burlington chaplin r12 chr Einbauanleitung - Seite 4

Blättern Sie online oder laden Sie pdf Einbauanleitung für Heizgerät Burlington chaplin r12 chr herunter. Burlington chaplin r12 chr 5 Seiten.

Heated with the summer electric heating kit only
Parts required:
The diagram of the summer electric heating kit as shown above is for reference only, and
can be purchased separately.
4
Connect to the electric supply via a fused spur. Then
6
check for leaks. At all times follow the installation
instructions supplied with the Summer Electric Heating
kit. All electric work must be done by a suitably qualified
person.
If the radiator is to be used for electric heating only ( not
5
connected to a central heating system ), then seal the
bottom inlet / outlet nipples with the blanking plugs.
Fill the radiator approximately 90% with a water mixture.
containing a rust inhibitor – failure to do this will lead to
leaking as the radiator rusts from the inside. Filling with
more than 90% liquid will lead to leaking as the water
mixture expands as it heats up.
After installation ...
● Use a screwdriver to open the air vent, heating
the liquid inside radiator till summer heating kit
stop working, once no liquid flowing out from the
air vent, use a screwdriver to close the air vent,
then the radiator is ready for use!
4 - 5
1x
Fill water
Water mixture volume (90% full ) :
R12 CHR : 3.1 liters
B