3C-Link 3C-MC-R16 Benutzerhandbuch - Seite 3
Blättern Sie online oder laden Sie pdf Benutzerhandbuch für Chassis 3C-Link 3C-MC-R16 herunter. 3C-Link 3C-MC-R16 6 Seiten. For 2u unmanagement converter chassis
Thanks for using our products. Please read this user's manual before
usage. Please contact us if you have any query related to installation or
operation. We will try our best to help you to settle the problem as soon as
possible.
Attentions:
Please follow up below instructions in order to make sure that you use
this devices properly and avoid to damage the device or hurt the
operators caused by improper operation.
1. Protect it from water and humidity.
2. Do not put it on unstable box or table.
3. Do not open the rack by yourself.
4. Please take out the plug from the socket before cleaning the device.
Do not use wet duster cloth and fluid.
5. Keep the room ventilation where the device lies and expedite the
blowhole at any time.
Product Overview:
Package Content:
When you unpack the product package, you shall find these items listed
below.
2U Unmanagement Converter Chassis
Two power supplies installed on the chassis
AC power cord
User's Manual
Accessories: rackmount screws, brackets, & bracket screws
Please inspect the contents, and report any apparent damage or missing
items immediately to your authorized reseller.
Product Features:
♦HOUSE UP TO 16 MEDIA CONVERTERS
♦STANDARD 19" RACKMOUNTABLE SIZE, 2U
♦NON-STOP OPERATION & MINIMAL DOWNTIME
♦HOT-SWAPPABLE
The following items are designed to be hot swappable to allow easy
and quick replacement:
- Media converters
- Power supplies with fans
♦ADEQUATE VENTILATION
- Provides one cooling fan on the left and right side
- Ventilation holes on each side
♦POWER REDUNDANCY & POWER ISOLATION
Two high quality internal power supplies provided for load-sharing
purpose.
- Load sharing mechanism: If one power supply should fail, the
redundant power supply is capable of taking over immediately
- Converter bay power isolation ensures each bay is electrically
isolated from each other
♦OVER CURRENT PROTECTION
- Fuses on PCB for each converter bay
- Fuse on each power supply
Front panel Display :
FRONT PANEL
The front panel of 2U Un-management Converter Chassis shows it is
capable of housing up to sixteen media converters in bay 1~16.