Axminster Trade Series Benutzerhandbuch - Seite 7

Blättern Sie online oder laden Sie pdf Benutzerhandbuch für Werkzeuge Axminster Trade Series herunter. Axminster Trade Series 20 Seiten. Wall mounted extractor

Filter Dust Bag
1. Locate the fi lter retaining belt (5) and dust bag (6).
2. Open up the dust bag and place it up and over the base of
the fi lter assembly (2), see fi g 09-10.
3. Straighten the fi lter retaining belt (5), position the belt
around the base of the fi lter making sure the belt slots down
into the fi lter's machined recess. Latch it down to hold and to
seal the fi lter assembly, see fi g 11-12.
Fig 09-10
Fig 11-12
Retaining belt recess
Base of fi lter
6
5
Latch
Mounting the Extractor to the Wall
Before mounting the extractor assembly make sure you allow
suffi cient clearance and height to comfortably operate the
NVR's control switch and shaker paddle operating handle.
1. We suggest you mount the wall mounting bracket (3) at a
height of 1,650mm from the workshop fl oor, see fi g 13.
DO NOT mount the unit too low that the dust bag (6) drags on
the workshop fl oor, see the 'Machine Footprint' on page 9.
1,650mm
Level
3
2. Mark a line 1,650mm above workshop fl oor. Locate the wall
mounting bracket (3), position the bracket against the wall
with the angle section protruding out. Using a level mark
the positions of the three holes in the bracket, see fi g 14.
3. Place the bracket (3) to one side, drill the three holes using
a 8mm masonry drill bit and secure the bracket in place using
three wall plugs, washers and screws (NOT Supplied).
7
Assembly
Fig 13
Fig 14
Continues Over....