aXtion pro M Installationshandbuch - Seite 2
Blättern Sie online oder laden Sie pdf Installationshandbuch für Tablet-Zubehör aXtion pro M herunter. aXtion pro M 5 Seiten.
Auch für aXtion pro M: Installationshandbuch (4 seiten)
Place water test paper inside, face
down to the front of case/ screen side.
Check the O-ring seated well.
Water test paper face down
O-ring is seated into
the channel around
the case.
Maintaining the 25º - 30º angle,
apply firm pressure to both sides
of the charging port until you hear
two audible click.
pro M
Installation Guide
ご利用ガイド
Open
charging
cover
1
3
5
Lift the back of the case from the
camera end
Align and adjoin the bottom
sections of the case at a 25º
- 30º angle.
Secure the screws in sequential number order to ensure
the case is evenly tightened, water stopper is inserted well
in the charging cover.
5
4
2
3
3
5
4
2
2
25° - 30°
4
4
5
1
1
5
6
4