Archer VR3 Installation, Betrieb und Wartung

Blättern Sie online oder laden Sie pdf Installation, Betrieb und Wartung für Controller Archer VR3 herunter. Archer VR3 7 Seiten. Vacuum regulator

Archer VR3 Installation, Betrieb und Wartung
 
Model VR3 Vacuum Regulator
General:
The Archer Instruments Model VR3 vacuum regulator is designed for use in
vacuum gas feed systems. The VR3 incorporates an integral graduated meter tube, which
provides a local indication of gas flow rate. The VR3 can be provided with or without an
integral rate control valve. *Note: For systems using an automatic switchover module, the
VR3 vacuum regulator should be plugged (rate valve removed) as the integral rate valve
can cause improper switchover operation.
Safety:
When working with chlorine, always use caution and follow applicable safety
procedures. General safety considerations:
* Store chlorine separately from ammonia.
* When using chlorine, avoid locations that expose the cylinder and equipment to direct
sunlight.
* Do not apply heater or heat source directly to chlorine cylinders.
* 150lb (upright) cylinders: Always keep cylinders upright and ensure the steel valve cap is
in place when moving cylinders. Once cylinder is in place, a safety chain should be used to
secure the cylinder.
* Ton Containers: Use appropriate handling equipment when moving ton containers. When
readying ton container for use, ensure valves are aligned vertically. The top valve accesses
gaseous chlorine and the bottom valve accesses liquid chlorine. The bottom valve should
never be touched unless your system employs a chlorine heat exchanger (evaporator)
designed expressly for use with liquid chlorine. When drawing gas from ton containers an
appropriate ton container adapter & drip leg must be used (also available from Archer
Instruments).
Archer Instruments, LLC                                                                                                                     www.archerinstruments.com 
Installation, Operation & Maintenance