CREE LIGHTING EDGE Series Installationsanleitung Handbuch
Blättern Sie online oder laden Sie pdf Installationsanleitung Handbuch für Außenleuchte CREE LIGHTING EDGE Series herunter. CREE LIGHTING EDGE Series 6 Seiten. Led pathway
IMPORTANT SAFEGUARDS
When using electrical equipment, basic safety precautions should always be followed
including the following:
READ AND FOLLOW ALL SAFETY
INSTRUCTIONS
1.
DANGER- Risk of shock- Disconnect power before installation.
DANGER – Risque de choc – Couper l'alimentation avant l'installation.
2.
This luminaire must be installed in accordance with the NEC or your local
electrical code. If you are not familiar with these codes and requirements, consult
a qualified electrician.
Ce produit doit être installé conformément à NEC ou votre code électrique local.
Si vous n'êtes pas familier avec ces codes et ces exigences, veuillez contacter un
électricien qualifié.
SAVE THESE INSTRUCTIONS FOR
FUTURE REFERENCE
TO INSTALL:
1
3
1 of 3
2
4
THE EDGE
INSTALLATION INSTRUCTIONS
INSTRUCTIONS D'INSTALLATION
REMOVING EXISTING BOLLARD
STEP 1:
To remove existing Bollard Pole from anchor
bolts, remove four 1/4-20 flat head screws at
base of pole and lift off pole and lens assembly
vertically. See Figure 1.
STEP 2:
Disconnect electrical supply connections.
STEP 3:
Remove nuts and jam nuts from anchor bolts
and set aside. Remove the inner frame assembly
and 8" base plate from anchor bolts.
INSTALL PATHWAY
STEP 1:
Remove 4" base plate from bottom of new
Pathway pole by removing three 1/4-20 flat head
screws at base of pole. See Figure 2.
STEP 2:
Connect 4" Pathway Base to steel transition
plate supplied in Retrofit Kit by inserting three
3/8 x 2.00 flat head screws up through the steel
plate and up through the bottom of the base.
Figure 3.
Secure with nuts. See
STEP 3:
Position the transition plate over existing anchor
bolts and secure with nuts set aside from Step 3.
STEP 4:
Attach L bracket to hole in transition plate using
#8 x 0.25 screw.
STEP 5:
Loosen 3/8-16 pan head screw located at the
arm base of optic assembly using a T-45 torx
Figure 4.
socket and ratchet. See
STEP 6:
Lift optic assembly from pole.
®
LED Pathway
Includes: XBP
CI347X02R1_B