Archon WD2010 Handbuch für Installation, Betrieb und Wartung - Seite 6

Blättern Sie online oder laden Sie pdf Handbuch für Installation, Betrieb und Wartung für Waschmaschine Archon WD2010 herunter. Archon WD2010 16 Seiten. Washdown stations

Archon WD2010 Handbuch für Installation, Betrieb und Wartung
INSTALLATION/OPERATION/MAINTENANCE INSTRUCTIONS FOR
ARCHON MODELS WD2010L, WD2010, WD2010H WASHDOWN STATIONS
In addition to the check valves recommendation, the installation must comply with
Local, State and Federal regulations related to the industry where it is being
installed. This may include installing back flow preventers or vacuum breakers.
IV.

OPERATION

A. Pre-operational Check
1.
Check that all installation instructions have been completed.
2.
Check that the manually operated steam valve is fully closed.
3.
Check that the manually operated water valve is fully closed.
B. Operating
1.
Turn water valve fully on. Keep it on throughout the entire operation process.
2.
Depress trigger of spray gun to establish full flow of water.
3.
Slowly and partially open the manually operated steam line valve to first check for leaks. If leaks are evident,
close valve, allow line to cool off, tighten connections, and repeat procedure until all leaks are stopped.
4.
Slowly open the manually operated steam valve (no more than 1/ 2 turn) while depressing the trigger of the
spray gun, then adjust the steam valve slowly until the desired water outlet temperature is obtained.
Important: When adjusting outlet temperature of the washdown station,
make certain the discharge spray gun is pointing in a safe direction.
C. Diaphragm Performance
The diaphragm is always exposed to cold water only. The diaphragm is expected to perform perfectly for years, but
with the material being an elastomer, the life in terms of time and number of operations is uncertain. However, we
offer a full replacement one-year warranty on the Diaphragm performance.
CAUTION
6
Installation: 1004 Rev 4
Issued: February 7, 2013